nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Acceptance sampling and reliability: the tradeoff between component quality and redundancy
|
Graves, Samuel B |
|
2000 |
38 |
1 |
p. 79-91 13 p. |
artikel |
2 |
A generic event control framework for modular flexible manufacturing systems
|
Park, Jonghun |
|
2000 |
38 |
1 |
p. 107-123 17 p. |
artikel |
3 |
Analysis, modeling and simulation of stiffness in machine tool drives
|
Ebrahimi, M |
|
2000 |
38 |
1 |
p. 93-105 13 p. |
artikel |
4 |
A neural-net approach to real time flow-shop sequencing
|
Lee, In |
|
2000 |
38 |
1 |
p. 125-147 23 p. |
artikel |
5 |
A solution of the bicriteria vehicle scheduling problems with time and area-dependent travel speeds
|
Park, Yang-Byung |
|
2000 |
38 |
1 |
p. 173-187 15 p. |
artikel |
6 |
Computer aided tolerance analysis for improved process control
|
Gerth, Richard J. |
|
2000 |
38 |
1 |
p. 1-19 19 p. |
artikel |
7 |
Direct integration of reverse engineering and rapid prototyping
|
Lee, Kwan H |
|
2000 |
38 |
1 |
p. 21-38 18 p. |
artikel |
8 |
Evaluating simple scheduling rules in a mixed shop environment
|
Ferrell Jr., W |
|
2000 |
38 |
1 |
p. 39-66 28 p. |
artikel |
9 |
Fixed cycle ordering policies for capacitated multiple item inventory systems with quantity discounts
|
Güder, Faruk |
|
2000 |
38 |
1 |
p. 67-77 11 p. |
artikel |
10 |
Lot streaming and scheduling heuristics for m-machine no-wait flowshops
|
Kumar, Subodha |
|
2000 |
38 |
1 |
p. 149-172 24 p. |
artikel |
11 |
Scheduling jobs on parallel machines applying neural network and heuristic rules
|
Park, Youngshin |
|
2000 |
38 |
1 |
p. 189-202 14 p. |
artikel |
12 |
The networked management of strategic alliances: Oriental and Occidental perceptions
|
Kidd, John |
|
2000 |
38 |
1 |
p. 203-214 12 p. |
artikel |