Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             14 results found
no title author magazine year volume issue page(s) type
1 A heuristic technique for generating minimal path and cutsets of a general network Al-Ghanim, Amjed M
1999
36 1 p. 45-55
11 p.
article
2 A neural network based model for abnormal pattern recognition of control charts Guh, Ruey-Shy
1999
36 1 p. 97-108
12 p.
article
3 A new triangular fuzzy Johnson algorithm 1 This is a modified and expanded version of the paper “A new fuzzy Johnson algorithm for continuous fuzzy domain,” presented at the 1997 7th IFSA World Congress, Czech Republic. 1 Hong, Tzung-Pei
1999
36 1 p. 179-200
22 p.
article
4 A note on Toyota's goal of sequencing mixed models on an assembly line Xiaobo, Zhao
1999
36 1 p. 57-65
9 p.
article
5 Application of virtual convex polytope in transforming protrusions for automated process planning Lee, Yuan-Shin
1999
36 1 p. 67-96
30 p.
article
6 A two-phased approach to setting due-dates in single machine job shops Veral, Emre A.
1999
36 1 p. 201-218
18 p.
article
7 Combining heteroscedastic antithetic forecasts Ridley, Dennis
1999
36 1 p. 227-230
4 p.
article
8 Feature-based assembly modeling and sequence generation Eng, Tiam-Hock
1999
36 1 p. 17-33
17 p.
article
9 Fuzzy development of crisp activity relationship charts for facilities layout Dweiri, Fikri
1999
36 1 p. 1-16
16 p.
article
10 Model development for deteriorating inventory in material requirement planning systems Wee, Hui-Ming
1999
36 1 p. 219-225
7 p.
article
11 Procedures for the evaluation of conflicts in rankings of alternatives Ray, Thomas
1999
36 1 p. 35-44
10 p.
article
12 Routing straddle carriers for the loading operation of containers using a beam search algorithm Kim, Kap Hwan
1999
36 1 p. 109-136
28 p.
article
13 Scheduling flowshops with finite buffers and sequence-dependent setup times Norman, Bryan A
1999
36 1 p. 163-177
15 p.
article
14 Scheduling in job shops with machine breakdowns: an experimental study Holthaus, Oliver
1999
36 1 p. 137-162
26 p.
article
                             14 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands