nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A batch scheduling scheme for the workcenter that supplies parts to a mixed-model assembly line
|
Baek, Jun-Geol |
|
1997 |
33 |
3-4 |
p. 757-760 4 p. |
artikel |
2 |
A batch splitting heuristic for dynamic job shop scheduling problem
|
Jeong, Hanil |
|
1997 |
33 |
3-4 |
p. 781-784 4 p. |
artikel |
3 |
A CAPP expert system for rotational components
|
Younis, M.A. |
|
1997 |
33 |
3-4 |
p. 509-512 4 p. |
artikel |
4 |
A competitive neural network algorithm for solving vehicle routing problem
|
Torki, Abdolhamid |
|
1997 |
33 |
3-4 |
p. 473-476 4 p. |
artikel |
5 |
Adaptive process monitoring using scale cusum for serially correlated processes
|
Lee, Sanghoon |
|
1997 |
33 |
3-4 |
p. 737-740 4 p. |
artikel |
6 |
A decision support model for the initial design of FMS
|
Shin, Hosub |
|
1997 |
33 |
3-4 |
p. 549-552 4 p. |
artikel |
7 |
A decision support system model in estimating budgets for standard figure tools at Mattel Toys
|
Manjunath, M.L. |
|
1997 |
33 |
3-4 |
p. 617-620 4 p. |
artikel |
8 |
A genetic algorithm for a single hoist scheduling in the printed-circuit-board electroplating line
|
Lim, Joon-Mook |
|
1997 |
33 |
3-4 |
p. 789-792 4 p. |
artikel |
9 |
Agent-based airline scheduling
|
Langerman, J.J. |
|
1997 |
33 |
3-4 |
p. 849-852 4 p. |
artikel |
10 |
A hybrid neural-network/mathematical prediction model for tandem cold mill
|
Cho, Sungzoon |
|
1997 |
33 |
3-4 |
p. 453-456 4 p. |
artikel |
11 |
Algorithms for determining capacities of individual buffers in assembly/disassembly systems
|
Jeong, Keun-Chae |
|
1997 |
33 |
3-4 |
p. 605-608 4 p. |
artikel |
12 |
A matrix approach for telecommunications technology selection
|
Kim, Kyeongtaek |
|
1997 |
33 |
3-4 |
p. 833-836 4 p. |
artikel |
13 |
A M/D x /1 vacation queue model for a signalized intersection
|
Hu, X.N. |
|
1997 |
33 |
3-4 |
p. 801-804 4 p. |
artikel |
14 |
Analysis of delay distributions in CDMA mobile switching system
|
Baek, Jang-Hyun |
|
1997 |
33 |
3-4 |
p. 821-824 4 p. |
artikel |
15 |
Analysis of multi-stage production/inventory system with an acceptable response time
|
Takeda, Ken |
|
1997 |
33 |
3-4 |
p. 725-728 4 p. |
artikel |
16 |
Analytic generation of workspace using the robot kinematics
|
Kee, Dohyung |
|
1997 |
33 |
3-4 |
p. 525-528 4 p. |
artikel |
17 |
An application of fuzzy set theory to inventory control models
|
Gen, Mitsuo |
|
1997 |
33 |
3-4 |
p. 553-556 4 p. |
artikel |
18 |
An approach to unify model definition and manipulation
|
Yang, De-Li |
|
1997 |
33 |
3-4 |
p. 661-663 3 p. |
artikel |
19 |
An approximation to the steady state probabilities of a multi-echelon repair model for a series system
|
Yanagi, Shigeru |
|
1997 |
33 |
3-4 |
p. 745-748 4 p. |
artikel |
20 |
A negotiation based scheduling for items with flexible process plans
|
Hwan Kim, Kap |
|
1997 |
33 |
3-4 |
p. 785-788 4 p. |
artikel |
21 |
An estimation model for completion times considering the time interval between interdependent R&D events
|
Cheol-Shin Kwon, |
|
1997 |
33 |
3-4 |
p. 613-616 4 p. |
artikel |
22 |
An evolutionary method for general surface-surface intersection problems
|
Cho, N.W. |
|
1997 |
33 |
3-4 |
p. 573-576 4 p. |
artikel |
23 |
An operation analysis of movable rack type AS/RS by use of system simulator
|
Yamaguchi, Norio |
|
1997 |
33 |
3-4 |
p. 677-680 4 p. |
artikel |
24 |
An operation scheme for make-to-order job-shop production systems
|
Choi, K. |
|
1997 |
33 |
3-4 |
p. 765-768 4 p. |
artikel |
25 |
An optimization-based decision support system for ship scheduling
|
Si-Hwa Kim, |
|
1997 |
33 |
3-4 |
p. 689-692 4 p. |
artikel |
26 |
Application of fuzzy theory to value engineering
|
Nagasawa, Shin'ya |
|
1997 |
33 |
3-4 |
p. 565-568 4 p. |
artikel |
27 |
A real-time sequence control system for the level production of the automobile assembly line
|
Wonjoon Choi, |
|
1997 |
33 |
3-4 |
p. 769-772 4 p. |
artikel |
28 |
ARL properties of a sample autocorrelation chart
|
Atienza, O.O. |
|
1997 |
33 |
3-4 |
p. 733-736 4 p. |
artikel |
29 |
A routing algorithm for a single transfer crane to load export containers onto a containership
|
Kim, Ki Young |
|
1997 |
33 |
3-4 |
p. 673-676 4 p. |
artikel |
30 |
A strategic approach to customer satisfaction in the telecommunication service market
|
Hahm, J. |
|
1997 |
33 |
3-4 |
p. 825-828 4 p. |
artikel |
31 |
A study on an inventory model for items with weibull ameliorating
|
Hwang, Heung-Suk |
|
1997 |
33 |
3-4 |
p. 701-704 4 p. |
artikel |
32 |
A study on the convergence of genetic algorithms
|
Kim, B.M. |
|
1997 |
33 |
3-4 |
p. 581-588 8 p. |
artikel |
33 |
A Tabu search approach for designing a non-hierarchical video-on-demand network architecture
|
Keun Kim, Yeo |
|
1997 |
33 |
3-4 |
p. 837-840 4 p. |
artikel |
34 |
A variant approach to product definition by recognizing functional requirement patterns
|
Tseng, Mitchell M. |
|
1997 |
33 |
3-4 |
p. 629-633 5 p. |
artikel |
35 |
Bayesian dynamic forecasting for attribute reliability
|
So Young Sohn, |
|
1997 |
33 |
3-4 |
p. 741-744 4 p. |
artikel |
36 |
Classification, relationships and forecasting models for telecommunication services
|
Bin Jun, Duk |
|
1997 |
33 |
3-4 |
p. 829-832 4 p. |
artikel |
37 |
Comparisons of optimal release policies for software systems
|
Shinohara, Yasuhide |
|
1997 |
33 |
3-4 |
p. 813-816 4 p. |
artikel |
38 |
Computer networks and interfirm relationships in the automobile industry: A comparative study of Japan and Korea
|
Yozi, Ichida |
|
1997 |
33 |
3-4 |
p. 635-638 4 p. |
artikel |
39 |
Constraint maintenance in engineering design system: An active object-oriented approach
|
Do, N.C. |
|
1997 |
33 |
3-4 |
p. 643-647 5 p. |
artikel |
40 |
Cooperative behavior of various agents in dynamic environment
|
Hiura, Akihide |
|
1997 |
33 |
3-4 |
p. 601-604 4 p. |
artikel |
41 |
Cost management system based on EUC concept
|
Jang, Hee-Ryn |
|
1997 |
33 |
3-4 |
p. 653-656 4 p. |
artikel |
42 |
Determining optimal retail price and lot size under day-terms supplier credit
|
Shinn, S.W. |
|
1997 |
33 |
3-4 |
p. 717-720 4 p. |
artikel |
43 |
Disassemblability of mechanical parts in automobile for recycling
|
Mok, H.S. |
|
1997 |
33 |
3-4 |
p. 621-624 4 p. |
artikel |
44 |
Efficient feature-based process planning for sculptured pocket machining
|
Jaekoo Joo, |
|
1997 |
33 |
3-4 |
p. 493-496 4 p. |
artikel |
45 |
Efficient inventory management in multi-echelon distribution systems
|
Yeong-joon Yoo, |
|
1997 |
33 |
3-4 |
p. 729-732 4 p. |
artikel |
46 |
Efficient operation of a multi-functional surface mounting device
|
Yu, Sungyeol |
|
1997 |
33 |
3-4 |
p. 797-800 4 p. |
artikel |
47 |
Enhanced exchange heuristic based resource constrained scheduler using ARTMAP
|
Song, Inkap R. |
|
1997 |
33 |
3-4 |
p. 469-472 4 p. |
artikel |
48 |
Ergonomic analysis of musculoskeletal discomforts among conversational VDT operators
|
Chung, Min K. |
|
1997 |
33 |
3-4 |
p. 521-524 4 p. |
artikel |
49 |
Estimating mean response time and positioning idle vehicles of automated guided vehicle systems in loop layout
|
Kim, Kap Hwan |
|
1997 |
33 |
3-4 |
p. 669-672 4 p. |
artikel |
50 |
Evaluation of assembly sequences using generalized flexible assembly systems scheduling problem
|
Jeong, B.J. |
|
1997 |
33 |
3-4 |
p. 777-780 4 p. |
artikel |
51 |
Fault tree analysis with fuzzy gates
|
Pan, HanSuk |
|
1997 |
33 |
3-4 |
p. 569-572 4 p. |
artikel |
52 |
File and workload allocation design for distributed database on a two-level local multi-access computer network
|
Jang, Gilsang |
|
1997 |
33 |
3-4 |
p. 649-652 4 p. |
artikel |
53 |
Generalized machine cell formation considering material flow and plant layout using modified self-organizing feature maps
|
Inho, Jang |
|
1997 |
33 |
3-4 |
p. 457-460 4 p. |
artikel |
54 |
Genetic algorithms for design for assembly: The remote constrained genetic algorithm
|
Liang, W.Y. |
|
1997 |
33 |
3-4 |
p. 593-596 4 p. |
artikel |
55 |
Genetic-based fuzzy models: Interest rate forecasting problem
|
Ju, Y.J. |
|
1997 |
33 |
3-4 |
p. 561-564 4 p. |
artikel |
56 |
Geometric reasoning for mill-turn machining process planning
|
Kim, Yong Se |
|
1997 |
33 |
3-4 |
p. 501-504 4 p. |
artikel |
57 |
Geometric reasoning for optimizing backward growing-based feature recognition
|
Joneja, Ajay |
|
1997 |
33 |
3-4 |
p. 489-492 4 p. |
artikel |
58 |
Hybrid evolutionary method for capacitated location-allocation problem
|
Gong, Dijin |
|
1997 |
33 |
3-4 |
p. 577-580 4 p. |
artikel |
59 |
Improved genetic algorithm for solving multiobjective solid transportation problem with fuzzy numbers
|
Li, Yinzhen |
|
1997 |
33 |
3-4 |
p. 589-592 4 p. |
artikel |
60 |
Integrated reverse engineering and rapid prototyping
|
Chen, Y.H. |
|
1997 |
33 |
3-4 |
p. 481-484 4 p. |
artikel |
61 |
Investigation of driving performance, vection, postural sway, and simulator sickness in a fixed-based driving simulator
|
Lee, Gene C.H. |
|
1997 |
33 |
3-4 |
p. 533-536 4 p. |
artikel |
62 |
Locating I O points of flexible manufacturing cells with the consideration of within-cell and inter-cell flow distance
|
Ho, Ying-Chin |
|
1997 |
33 |
3-4 |
p. 665-668 4 p. |
artikel |
63 |
Manufacturing cell formation in the presence of flexible cell locations and material transporters
|
Logendran, Rasaratnam |
|
1997 |
33 |
3-4 |
p. 545-548 4 p. |
artikel |
64 |
Method for solving nonlinear goal programming with interval coefficients using genetic algorithm
|
Taguchi, Takeaki |
|
1997 |
33 |
3-4 |
p. 597-600 4 p. |
artikel |
65 |
Minimizing the number of tardy jobs in multi-period cell loading problems
|
Süer, Gürsel A. |
|
1997 |
33 |
3-4 |
p. 721-724 4 p. |
artikel |
66 |
Mission reliability of an automatic control system integrated with distributed intelligent built-in-test systems
|
Wang-Jin Yoo, |
|
1997 |
33 |
3-4 |
p. 753-756 4 p. |
artikel |
67 |
Modeling traffic operations at electronic toll collection and traffic management systems
|
Zarrillo, M.L. |
|
1997 |
33 |
3-4 |
p. 857-860 4 p. |
artikel |
68 |
Modern modeling of a classic multiperiod problem
|
Jo, Geun-Sik |
|
1997 |
33 |
3-4 |
p. 681-684 4 p. |
artikel |
69 |
Multimodal express shipment service design: Models and algorithms
|
Kim, Daeki |
|
1997 |
33 |
3-4 |
p. 685-688 4 p. |
artikel |
70 |
Multi-period part selection and loading problems in flexible manufacturing systems
|
Lee, Dong-Ho |
|
1997 |
33 |
3-4 |
p. 541-544 4 p. |
artikel |
71 |
Network dual steepest-edge methods for solving capacitated multicommodity network problems
|
Chiun-Ming Liu, |
|
1997 |
33 |
3-4 |
p. 697-700 4 p. |
artikel |
72 |
Neural network approach for multicriteria solid transportation problem
|
Li, Yinzhen |
|
1997 |
33 |
3-4 |
p. 465-468 4 p. |
artikel |
73 |
Nonlinear prediction of manufacturing systems through explicit and implicit data mining
|
Kim, Steven H. |
|
1997 |
33 |
3-4 |
p. 461-464 4 p. |
artikel |
74 |
On-line determination of steady state in simulation outputs
|
Lee, Young-Hae |
|
1997 |
33 |
3-4 |
p. 805-808 4 p. |
artikel |
75 |
Optimal routing in multiple I O data network using neural network with perturbed energy function
|
Tsujimura, Yasuhiro |
|
1997 |
33 |
3-4 |
p. 477-480 4 p. |
artikel |
76 |
Optimal tool selection for pocket machining in process planning
|
Kyoung, Y.M. |
|
1997 |
33 |
3-4 |
p. 505-508 4 p. |
artikel |
77 |
Order picking systems: Batching and storage assignment strategies
|
Tang, Loon C. |
|
1997 |
33 |
3-4 |
p. 817-820 4 p. |
artikel |
78 |
Parallel machine scheduling problems using memetic algorithms
|
Runwei Cheng, |
|
1997 |
33 |
3-4 |
p. 761-764 4 p. |
artikel |
79 |
Parallel processing circuit of line image using neuristor
|
Takemae, Tadashi |
|
1997 |
33 |
3-4 |
p. 625-628 4 p. |
artikel |
80 |
Performance of multiclass BCMP model for computer system based on fuzzy set theory
|
Jo, Jung Bok |
|
1997 |
33 |
3-4 |
p. 557-560 4 p. |
artikel |
81 |
Prediction of future origin-destination matrix of air passengers by fratar and gravity models
|
Ceha, Rakhmat |
|
1997 |
33 |
3-4 |
p. 845-848 4 p. |
artikel |
82 |
Presenting map information on a global positioning system
|
Kim, Byoungju |
|
1997 |
33 |
3-4 |
p. 529-532 4 p. |
artikel |
83 |
Price-based buffer sizing in assembly systems
|
Lee, Kyung K. |
|
1997 |
33 |
3-4 |
p. 709-712 4 p. |
artikel |
84 |
Production planning in semiconductor wafer fab considering variable cycle times
|
Lee, Youngsu |
|
1997 |
33 |
3-4 |
p. 713-716 4 p. |
artikel |
85 |
Production sequencing problem with reentrant work flows and sequence dependent setup times
|
Hark Hwang, |
|
1997 |
33 |
3-4 |
p. 773-776 4 p. |
artikel |
86 |
Psychophysical measurements as an effective way of evaluating climbability of wood treated utility poles
|
Beauchamp, Yves |
|
1997 |
33 |
3-4 |
p. 513-516 4 p. |
artikel |
87 |
Quick and precise clustering of arbitrarily shaped flat patterns based on stringy effect
|
Cheng, S.K. |
|
1997 |
33 |
3-4 |
p. 485-488 4 p. |
artikel |
88 |
Research of measuring the customer satisfaction for information systems
|
Chikara, Toshinori |
|
1997 |
33 |
3-4 |
p. 639-642 4 p. |
artikel |
89 |
Search for the Blind : A schema independent query method using concept hierarchy and keywords
|
Lee, Dong-Ha |
|
1997 |
33 |
3-4 |
p. 657-660 4 p. |
artikel |
90 |
Search heuristics for a parallel machine scheduling problem with ready times and due dates
|
Park, Moon-Won |
|
1997 |
33 |
3-4 |
p. 793-796 4 p. |
artikel |
91 |
Simulation of a gas-liquid phase-change micro-actuator
|
Kato, Shigeo |
|
1997 |
33 |
3-4 |
p. 609-612 4 p. |
artikel |
92 |
Some advanced semiconductor production-inventory management systems and their performances
|
Katayama, Hiroshi |
|
1997 |
33 |
3-4 |
p. 705-708 4 p. |
artikel |
93 |
Stochastic analysis of a U-shaped production line with multiple workers
|
Nakade, Koichi |
|
1997 |
33 |
3-4 |
p. 809-812 4 p. |
artikel |
94 |
Structural reliability assessment based on directional vector approximation method
|
Masaaki Yonezawa, |
|
1997 |
33 |
3-4 |
p. 749-752 4 p. |
artikel |
95 |
Subdivision methods of converting STEP into VRML on Web
|
Kim, N.K. |
|
1997 |
33 |
3-4 |
p. 497-500 4 p. |
artikel |
96 |
Targeting and scheduling problem for field artillery
|
Kwon, Ojeong |
|
1997 |
33 |
3-4 |
p. 693-696 4 p. |
artikel |
97 |
Tool requirements in manufacturing systems under dynamic tool sharing
|
Koo, Pyung-Hoi |
|
1997 |
33 |
3-4 |
p. 537-540 4 p. |
artikel |
98 |
User required information modality and structure of in-vehicle navigation system focused on the urban commuter
|
Cha, DooWon |
|
1997 |
33 |
3-4 |
p. 517-520 4 p. |
artikel |
99 |
Vehicle scheduling problems with time-varying speed
|
Park, Yang-Byung |
|
1997 |
33 |
3-4 |
p. 853-856 4 p. |
artikel |
100 |
Vertical integration in the telecommunication market
|
Lee, Deok-joo |
|
1997 |
33 |
3-4 |
p. 841-844 4 p. |
artikel |