nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A closer look at the use of data envelopment analysis for technology selection
|
Baker, R.C. |
|
1997 |
32 |
1 |
p. 101-108 8 p. |
artikel |
2 |
A computational investigation into shapes of polyhedra
|
Eiselt, H.A. |
|
1997 |
32 |
1 |
p. 19-28 10 p. |
artikel |
3 |
A cutting stock procedure for printed circuit board production
|
Mornar, Vedran |
|
1997 |
32 |
1 |
p. 57-66 10 p. |
artikel |
4 |
Algorithms for sequencing mixed models on an assembly line in a JIT production system
|
Xiaobo, Zhao |
|
1997 |
32 |
1 |
p. 47-56 10 p. |
artikel |
5 |
An economic model for air cargo overbooking under stochastic capacity
|
Kasilingam, R.G. |
|
1997 |
32 |
1 |
p. 221-226 6 p. |
artikel |
6 |
Application of design and control tools in a multirobot cell
|
Jang, Jaejin |
|
1997 |
32 |
1 |
p. 89-100 12 p. |
artikel |
7 |
A procedure-oriented generic bill of materials
|
Olsen, Kai A. |
|
1997 |
32 |
1 |
p. 29-45 17 p. |
artikel |
8 |
A scheduling procedure for a general class of resource-constrained projects
|
Sung, C.S. |
|
1997 |
32 |
1 |
p. 9-17 9 p. |
artikel |
9 |
A strategic MIGP model for acquiring advanced technologies
|
Gagnon, Roger J. |
|
1997 |
32 |
1 |
p. 145-168 24 p. |
artikel |
10 |
A tabu search approach to the cell formation problem
|
Aljaber, Nasser |
|
1997 |
32 |
1 |
p. 169-185 17 p. |
artikel |
11 |
Best-first search and dynamic programming methods for cutting problems: The cases of one or more stock plates
|
Hifi, Mhand |
|
1997 |
32 |
1 |
p. 187-205 19 p. |
artikel |
12 |
Bounds for production lot sizing with machine breakdowns
|
Chung, Kun-Jen |
|
1997 |
32 |
1 |
p. 139-144 6 p. |
artikel |
13 |
Comparison of solution procedures to the facility location problem
|
Houshyar, Azim |
|
1997 |
32 |
1 |
p. 77-87 11 p. |
artikel |
14 |
Costs in design of scheduling algorithms: A study on branch-and-bound methodology
|
Amar, Amar Dev |
|
1997 |
32 |
1 |
p. 129-138 10 p. |
artikel |
15 |
Developing a simulated annealing algorithm for the cutting stock problem
|
Lai, K.K. |
|
1997 |
32 |
1 |
p. 115-127 13 p. |
artikel |
16 |
Editorial Board
|
|
|
1997 |
32 |
1 |
p. IFC- 1 p. |
artikel |
17 |
Multiple criteria clustering algorithm for solving the group technology problem with multiple process routings
|
Won, Youkyung |
|
1997 |
32 |
1 |
p. 207-220 14 p. |
artikel |
18 |
Neural networks in generalizing expert knowledge
|
Wang, Shouhong |
|
1997 |
32 |
1 |
p. 67-76 10 p. |
artikel |
19 |
Period batch control for group technology—An improved procedure
|
Rachamadugu, Ram |
|
1997 |
32 |
1 |
p. 1-7 7 p. |
artikel |
20 |
Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs
|
Nudtasomboon, Nudtapon |
|
1997 |
32 |
1 |
p. 227-242 16 p. |
artikel |
21 |
Second call for papers 21st international conference on computers and industrial engineering
|
|
|
1997 |
32 |
1 |
p. I-III nvt p. |
artikel |
22 |
The distribution free job control problem
|
Moon, Ilkyeong |
|
1997 |
32 |
1 |
p. 109-113 5 p. |
artikel |