nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Abstract mathematical model of general management information systems
|
Guangcheng, Zhang |
|
1996 |
31 |
3-4 |
p. 893-895 3 p. |
artikel |
2 |
A computer network based control architecture for autonomous distributed multirobot systems
|
Yasuda, Gen'ichi |
|
1996 |
31 |
3-4 |
p. 697-702 6 p. |
artikel |
3 |
Activity-based costing model for joint products
|
Tsai, Wen-Hsien |
|
1996 |
31 |
3-4 |
p. 725-729 5 p. |
artikel |
4 |
A distributed scheduling and shop floor control method
|
Hwan Kim, Kap |
|
1996 |
31 |
3-4 |
p. 583-586 4 p. |
artikel |
5 |
AE behaviors evaluation with bp neural network
|
Cheng, Runwei |
|
1996 |
31 |
3-4 |
p. 867-871 5 p. |
artikel |
6 |
A genetic algorithm based approach to optimal fixture configuration
|
Wu, N.H. |
|
1996 |
31 |
3-4 |
p. 919-924 6 p. |
artikel |
7 |
A genetic algorithm for interval nonlinear integer programming problem
|
Yokota, Takao |
|
1996 |
31 |
3-4 |
p. 913-917 5 p. |
artikel |
8 |
Agile monitoring system for turning of difflicult-to-cut materials
|
Wangi, Z.Y. |
|
1996 |
31 |
3-4 |
p. 803-811 9 p. |
artikel |
9 |
A Model for estimating the potential demand of high touch product
|
W. Lee, Myun |
|
1996 |
31 |
3-4 |
p. 653-656 4 p. |
artikel |
10 |
A multistage supergame of downstream pollution
|
A. Petrosjan, Leon |
|
1996 |
31 |
3-4 |
p. 833-837 5 p. |
artikel |
11 |
An analysis of the cost structure of telecommunication industry in Korea
|
Oh Hyung-sik, |
|
1996 |
31 |
3-4 |
p. 719-724 6 p. |
artikel |
12 |
An application of psychophysical ratings to external force estimation
|
Park, Donghyun |
|
1996 |
31 |
3-4 |
p. 675-680 6 p. |
artikel |
13 |
An approximate solution to a jit-based ordering system
|
Watanabe, Norio |
|
1996 |
31 |
3-4 |
p. 565-569 5 p. |
artikel |
14 |
An artificial intelligence system of trouble diagnosis for aircraft engines
|
Hui, Yang |
|
1996 |
31 |
3-4 |
p. 797-801 5 p. |
artikel |
15 |
An improvement for mewma in multivariate process control
|
Yumin, Liu |
|
1996 |
31 |
3-4 |
p. 779-781 3 p. |
artikel |
16 |
An integrated vision system based on coining algorithms
|
Uttal, William R. |
|
1996 |
31 |
3-4 |
p. 827-832 6 p. |
artikel |
17 |
An interactive system for constructing cat's cradle string diagram using GA
|
Budiarto, Rahmat |
|
1996 |
31 |
3-4 |
p. 939-943 5 p. |
artikel |
18 |
Announcements
|
|
|
1996 |
31 |
3-4 |
p. I-II nvt p. |
artikel |
19 |
A nueral netwoilc model for environmental predicadon: Case study for China
|
Linyan, Sun |
|
1996 |
31 |
3-4 |
p. 879-883 5 p. |
artikel |
20 |
A performance evaluation model for FMS based on RAM and LCC using FACTOR/AIM
|
Hwang, Heung-Suk |
|
1996 |
31 |
3-4 |
p. 593-598 6 p. |
artikel |
21 |
Application of I.E. to the plan of production line in factory
|
Qiqin, Chu |
|
1996 |
31 |
3-4 |
p. 561-564 4 p. |
artikel |
22 |
Applications and development of industrial engineering in China
|
Xu, Weiman |
|
1996 |
31 |
3-4 |
p. 537-542 6 p. |
artikel |
23 |
A quantitative method used in negotiation support systems
|
Iinghua, Huang |
|
1996 |
31 |
3-4 |
p. 821-826 6 p. |
artikel |
24 |
Architectural requirements for rapid development of agile manufacturing systems
|
Jung, Mooyoung |
|
1996 |
31 |
3-4 |
p. 551-554 4 p. |
artikel |
25 |
A systematic planning approach to implementing total quality management through quality function deployment technique
|
Hongen, Liu |
|
1996 |
31 |
3-4 |
p. 747-751 5 p. |
artikel |
26 |
A unified framework for modeling, simulating and explaining engineering systems
|
Shilong, Ma |
|
1996 |
31 |
3-4 |
p. 839-842 4 p. |
artikel |
27 |
Author index
|
|
|
1996 |
31 |
3-4 |
p. III- 1 p. |
artikel |
28 |
A view of group decision making process and bivoting approach
|
Lei, Yang |
|
1996 |
31 |
3-4 |
p. 945-948 4 p. |
artikel |
29 |
Building a financial diagnosis system based on fuzzy logic production system
|
Kaneko, Takaomi |
|
1996 |
31 |
3-4 |
p. 743-746 4 p. |
artikel |
30 |
CIM implementation through at and MRP integration
|
Lee, Young-Q |
|
1996 |
31 |
3-4 |
p. 609-612 4 p. |
artikel |
31 |
Computer aided setup planning for machining processes
|
Kim, In-Ho |
|
1996 |
31 |
3-4 |
p. 613-617 5 p. |
artikel |
32 |
Concurrent engineering: Supporting subsystems
|
Thomas Jr, Merle |
|
1996 |
31 |
3-4 |
p. 571-575 5 p. |
artikel |
33 |
Constrained optimization using interval analysis
|
Ichida, K. |
|
1996 |
31 |
3-4 |
p. 933-937 5 p. |
artikel |
34 |
Design of optimum grip and control area for one-handed manual control devices
|
Kim, Jae Young |
|
1996 |
31 |
3-4 |
p. 661-664 4 p. |
artikel |
35 |
Determination of an optimal configuration of operating policies for direct-input-output manufacturing systems using the Taguchi method
|
Um, Joom-Mock |
|
1996 |
31 |
3-4 |
p. 555-560 6 p. |
artikel |
36 |
Diagnosing for signal in multiple correlated processes
|
Yizhong, Ma |
|
1996 |
31 |
3-4 |
p. 817-820 4 p. |
artikel |
37 |
Economic aspects of environmental investment in plant facilities
|
Iijima, M. |
|
1996 |
31 |
3-4 |
p. 713-717 5 p. |
artikel |
38 |
Effect of tool vibrations on surface roughness during lathe dry turning process
|
Thomas, M. |
|
1996 |
31 |
3-4 |
p. 637-644 8 p. |
artikel |
39 |
EIQNK curve analysis for the design of distribution center and warehouse with spline function
|
Kitaoka, Masatosi |
|
1996 |
31 |
3-4 |
p. 635-636 2 p. |
artikel |
40 |
Eliciting and managing information for product definition
|
Morris, Linda |
|
1996 |
31 |
3-4 |
p. 665-668 4 p. |
artikel |
41 |
Evolution program for nonlinear goal programming
|
Zheng, D.W |
|
1996 |
31 |
3-4 |
p. 907-911 5 p. |
artikel |
42 |
Experimental comparison of the switching heuristics for aggregate production planning problem
|
Cha, Chun Nam |
|
1996 |
31 |
3-4 |
p. 625-630 6 p. |
artikel |
43 |
Feature modelling from 2D drawings and product information description
|
Wenfeng, Li |
|
1996 |
31 |
3-4 |
p. 681-684 4 p. |
artikel |
44 |
Fuzzy assembly line balancing using genetic algorithms
|
Gen, Mitsuo |
|
1996 |
31 |
3-4 |
p. 631-634 4 p. |
artikel |
45 |
Genetic algorithm for robot selection and work station assignment problem
|
Zhao, Linhu |
|
1996 |
31 |
3-4 |
p. 599-602 4 p. |
artikel |
46 |
Genetic algorithms for designing loop layout manufacturing systems
|
Cheng, Runwei |
|
1996 |
31 |
3-4 |
p. 587-591 5 p. |
artikel |
47 |
HIT-IIP: an information integrating platform for CIM system based on client/server architecture
|
Gang, Wang |
|
1996 |
31 |
3-4 |
p. 603-607 5 p. |
artikel |
48 |
IISICS for intelligent cooperation between sub-systems in a complex system
|
Jonker, J. |
|
1996 |
31 |
3-4 |
p. 885-888 4 p. |
artikel |
49 |
Improving the flexibility for replicated data management in distributed database systems
|
Wu, Chienwen |
|
1996 |
31 |
3-4 |
p. 901-905 5 p. |
artikel |
50 |
Interlocking number string and code matrix
|
Yee, Soung Ryong |
|
1996 |
31 |
3-4 |
p. 929-932 4 p. |
artikel |
51 |
Investigation of cutting parameter effects on surface roughness in lathe boring operation by use of a full factorial design
|
Beauchamp, Yves |
|
1996 |
31 |
3-4 |
p. 645-651 7 p. |
artikel |
52 |
Knowledge based quality system in support of space shuttle operations
|
Hosni, Yasser A. |
|
1996 |
31 |
3-4 |
p. 767-773 7 p. |
artikel |
53 |
Manual lifting task risk evaluation using computer vision system
|
Wang, M.J. |
|
1996 |
31 |
3-4 |
p. 657-660 4 p. |
artikel |
54 |
Manufacturing technology in Korea
|
Cho, Kyu - Kab |
|
1996 |
31 |
3-4 |
p. 543-549 7 p. |
artikel |
55 |
Master-slave intelligent robot telepresence system
|
Wei, Wu |
|
1996 |
31 |
3-4 |
p. 703-706 4 p. |
artikel |
56 |
Multi-agent system for cost estimation
|
Ping, Liu |
|
1996 |
31 |
3-4 |
p. 731-735 5 p. |
artikel |
57 |
Multi-dimention dynamic testing of multi-hierarchy man-power and its expert system of group optimization
|
Qun, Wang |
|
1996 |
31 |
3-4 |
p. 707-712 6 p. |
artikel |
58 |
Natural language interfaces as expert systems r+or tv nd u strial applicatiqks
|
Eid, M.S. |
|
1996 |
31 |
3-4 |
p. 843-847 5 p. |
artikel |
59 |
Navigating the internet for engineering information
|
Dessouky, Ibtesam A. |
|
1996 |
31 |
3-4 |
p. 889-892 4 p. |
artikel |
60 |
Neural network approach for allocation with capacity
|
Gong, Dijin |
|
1996 |
31 |
3-4 |
p. 849-854 6 p. |
artikel |
61 |
Neural networks for solving multicriteria solid transportation problem
|
Ida, Kenichi |
|
1996 |
31 |
3-4 |
p. 873-877 5 p. |
artikel |
62 |
Neural networks in quality function deployment
|
Zhang, Xiping |
|
1996 |
31 |
3-4 |
p. 669-673 5 p. |
artikel |
63 |
Optimal design of a star-LAN using neural networks
|
GEN, Mitsuo |
|
1996 |
31 |
3-4 |
p. 855-859 5 p. |
artikel |
64 |
Optimization design of an axial-flow fan used for mining local-ventilation
|
Dugao, Zhou |
|
1996 |
31 |
3-4 |
p. 691-696 6 p. |
artikel |
65 |
Preface
|
|
|
1996 |
31 |
3-4 |
p. ix-x nvt p. |
artikel |
66 |
Prioritized constraint network representation and processing for concurrent engineering models
|
Kim, Yeongho |
|
1996 |
31 |
3-4 |
p. 577-581 5 p. |
artikel |
67 |
Q control charts for negative binomial distribution
|
Yun, Ma |
|
1996 |
31 |
3-4 |
p. 813-816 4 p. |
artikel |
68 |
Quality system an integral part of total quality management
|
Ma, Roderick |
|
1996 |
31 |
3-4 |
p. 753-757 5 p. |
artikel |
69 |
Research on intelligence recognition and reconstruction of engineering graph
|
Weining, Fang |
|
1996 |
31 |
3-4 |
p. 685-689 5 p. |
artikel |
70 |
Scheduling system for multi-process production
|
Fukushima, K. |
|
1996 |
31 |
3-4 |
p. 619-623 5 p. |
artikel |
71 |
SIMBASE: An economic justification tool using project-based simulation
|
Rho, Jae-Jeung |
|
1996 |
31 |
3-4 |
p. 737-741 5 p. |
artikel |
72 |
Simulated annealing for the quadratic assignment problem: A further study
|
Peng, Tian |
|
1996 |
31 |
3-4 |
p. 925-928 4 p. |
artikel |
73 |
Solving fuzzy shortest path problems by neural networks
|
Li, Yinzhen |
|
1996 |
31 |
3-4 |
p. 861-865 5 p. |
artikel |
74 |
Statistical games and software tools for quality assurance based on statistical process control
|
Takahashi, Takenori |
|
1996 |
31 |
3-4 |
p. 759-765 7 p. |
artikel |
75 |
Study and implementation of the virtual view in unix
|
Xuanxiong, Lin |
|
1996 |
31 |
3-4 |
p. 897-900 4 p. |
artikel |
76 |
The economic design of cumulative sum charts used to maintain current control of non-normal process means
|
Haridy, Abdellatif M.A. |
|
1996 |
31 |
3-4 |
p. 783-790 8 p. |
artikel |
77 |
Tool life prediction for cup shaped cold forgings with fuzzy language risk analysis and fuzzy inference
|
Ohasbi, Takahiro |
|
1996 |
31 |
3-4 |
p. 791-795 5 p. |
artikel |
78 |
Variability detection and robustness design in complex production system
|
Jichao, Xu |
|
1996 |
31 |
3-4 |
p. 775-778 4 p. |
artikel |