nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A comparative study of neural network and Box-Jenkins ARIMA modeling in time series prediction
|
Ho, S.L |
|
2002 |
|
2-4 |
p. 371-375 5 p. |
artikel |
2 |
A computerised minimum distance algorithm for machining of sculptured surfaces
|
Masood, S.H. |
|
2002 |
|
2-4 |
p. 291-297 7 p. |
artikel |
3 |
A decision support system for cellular manufacturing system design
|
Luong, L |
|
2002 |
|
2-4 |
p. 457-470 14 p. |
artikel |
4 |
A genetic algorithm for solving economic lot size scheduling problem
|
Sarker, Ruhul |
|
2002 |
|
2-4 |
p. 189-198 10 p. |
artikel |
5 |
A heuristic for job shop scheduling to minimize total weighted tardiness
|
Asano, Makoto |
|
2002 |
|
2-4 |
p. 137-147 11 p. |
artikel |
6 |
An agent-based framework for global purchasing and manufacturing in a shoe industry
|
Kim, Tae Woon |
|
2002 |
|
2-4 |
p. 495-506 12 p. |
artikel |
7 |
An expert system for evaluating the make or buy decision
|
Humphreys, P. |
|
2002 |
|
2-4 |
p. 567-585 19 p. |
artikel |
8 |
An improved model for vehicle routing problem with time constraint based on genetic algorithm
|
Hwang, Heung-Suk |
|
2002 |
|
2-4 |
p. 361-369 9 p. |
artikel |
9 |
An integrated model for the design of end-of-aisle order picking system and the determination of unit load sizes of AGVs
|
Hwang, Hark |
|
2002 |
|
2-4 |
p. 249-258 10 p. |
artikel |
10 |
An optimal batch size for a JIT manufacturing system
|
Khan, Lutfar R |
|
2002 |
|
2-4 |
p. 127-136 10 p. |
artikel |
11 |
A path planning algorithm for industrial robots
|
Ting, Y. |
|
2002 |
|
2-4 |
p. 299-308 10 p. |
artikel |
12 |
Artificial neural network based predictive method for flood disaster
|
Wei, Yiming |
|
2002 |
|
2-4 |
p. 383-390 8 p. |
artikel |
13 |
A shape-based block layout approach to facility layout problems using hybrid genetic algorithm
|
Lee, Young Hae |
|
2002 |
|
2-4 |
p. 237-248 12 p. |
artikel |
14 |
Assessing quality performance based on the on-line sensor measurements using neural networks
|
Chang, Dong Shang |
|
2002 |
|
2-4 |
p. 417-424 8 p. |
artikel |
15 |
Beam search for sequencing point operations in flat plate manufacturing
|
Shayan, E |
|
2002 |
|
2-4 |
p. 309-315 7 p. |
artikel |
16 |
Cell formation with reduction in setup times
|
Ohta, Hiroshi |
|
2002 |
|
2-4 |
p. 317-327 11 p. |
artikel |
17 |
Cluster analysis in industrial market segmentation through artificial neural network
|
Kuo, R.J |
|
2002 |
|
2-4 |
p. 391-399 9 p. |
artikel |
18 |
Communication infrastructure in distributed scheduling
|
Yen, Benjamin P.-C |
|
2002 |
|
2-4 |
p. 149-161 13 p. |
artikel |
19 |
Computer aided EDM electrode design
|
Ding, X.M. |
|
2002 |
|
2-4 |
p. 259-269 11 p. |
artikel |
20 |
Cost/time estimation in flat plate processing using fuzzy modeling
|
Jahan-Shahi, H |
|
2002 |
|
2-4 |
p. 555-566 12 p. |
artikel |
21 |
Design of a suitable production management system for a manufacturing company
|
Lejtman, Yvonne |
|
2002 |
|
2-4 |
p. 169-174 6 p. |
artikel |
22 |
Efficient Monte Carlo simulation method of GERT-type network for project management
|
Kurihara, Kenzo |
|
2002 |
|
2-4 |
p. 521-531 11 p. |
artikel |
23 |
Electronic commerce front-end in apparel supply chain
|
Yen, Benjamin P.-C |
|
2002 |
|
2-4 |
p. 471-480 10 p. |
artikel |
24 |
Heuristic approaches for part assignment in cell formation
|
Mukattash, A.M. |
|
2002 |
|
2-4 |
p. 329-341 13 p. |
artikel |
25 |
Hybrid feature modeling for sport shoe sole design
|
Butdee, S |
|
2002 |
|
2-4 |
p. 271-279 9 p. |
artikel |
26 |
Implementation and evaluation of failsafe computer-controlled systems
|
Ting, Y. |
|
2002 |
|
2-4 |
p. 401-415 15 p. |
artikel |
27 |
Integrated optimization of inventory-distribution systems by random local search and a genetic algorithm
|
Yokoyama, Masao |
|
2002 |
|
2-4 |
p. 175-188 14 p. |
artikel |
28 |
Investigation of port capacity under a new approach by computer simulation
|
Kia, M |
|
2002 |
|
2-4 |
p. 533-540 8 p. |
artikel |
29 |
Loading of pallets on identical CNC machines with cyclic schedules
|
Kayaligil, Sinan |
|
2002 |
|
2-4 |
p. 221-230 10 p. |
artikel |
30 |
Manufacturing cell formation using a new self-organizing neural network
|
Guerrero, Fernando |
|
2002 |
|
2-4 |
p. 377-382 6 p. |
artikel |
31 |
Modelling a nationwide crop planning problem using a multiple criteria decision making tool
|
Sarker, R.A. |
|
2002 |
|
2-4 |
p. 541-553 13 p. |
artikel |
32 |
Modelling of a continuous food pressing process by dimensional analysis
|
Thurairajasingam, E |
|
2002 |
|
2-4 |
p. 343-351 9 p. |
artikel |
33 |
Performance analysis for closed-loop production systems with unreliable machines and random processing times
|
Paik, C.H. |
|
2002 |
|
2-4 |
p. 207-220 14 p. |
artikel |
34 |
Planning accelerated life tests with three constant stress levels
|
Tang, Loon-Ching |
|
2002 |
|
2-4 |
p. 439-446 8 p. |
artikel |
35 |
Probabilistic safety assessment and reliability based maintenance policies: application to the emergency diesel generators of a nuclear power plant
|
Abdul-Nour, Georges |
|
2002 |
|
2-4 |
p. 433-438 6 p. |
artikel |
36 |
Productivity improvement through the use of industrial microwave technologies
|
Ku, H.S |
|
2002 |
|
2-4 |
p. 281-290 10 p. |
artikel |
37 |
Reliability design of structural system with cost effectiveness during life cycle
|
Nakanishi, Shingo |
|
2002 |
|
2-4 |
p. 447-456 10 p. |
artikel |
38 |
SAFE: secure agent roaming for e-commerce
|
Guan, Sheng-Uei |
|
2002 |
|
2-4 |
p. 481-493 13 p. |
artikel |
39 |
Scheduling flow shops in the environment of multi-functional machine tools
|
Li, Guofu |
|
2002 |
|
2-4 |
p. 163-168 6 p. |
artikel |
40 |
Semiconductor yield models using contagious distributions and their limiting forms
|
Park, Kwang-Su |
|
2002 |
|
2-4 |
p. 115-125 11 p. |
artikel |
41 |
Synchronous quality function deployment (QFD) over world wide web
|
Huang, G.Q |
|
2002 |
|
2-4 |
p. 425-431 7 p. |
artikel |
42 |
Teletraffic analysis of cellular communication systems with general mobility based on hyper-Erlang characterization
|
Yeo, Kunmin |
|
2002 |
|
2-4 |
p. 507-520 14 p. |
artikel |
43 |
Theoretical and experimental analysis of operation lead times based on the IMPOS approach
|
Fallah, H |
|
2002 |
|
2-4 |
p. 107-114 8 p. |
artikel |
44 |
The Synchronizer, a model for feasibility analysis and financial planning
|
Moussa, N. |
|
2002 |
|
2-4 |
p. 587-594 8 p. |
artikel |
45 |
The 26th International Conference on Computers & Industrial Engineering
|
Dessouky, M.I |
|
2002 |
|
2-4 |
p. 105- 1 p. |
artikel |
46 |
Threshold value for the number of cells in group technology
|
Sobhanallahi, M.A. |
|
2002 |
|
2-4 |
p. 231-236 6 p. |
artikel |
47 |
Variable period adaptive genetic algorithm
|
Chew, Ek Peng |
|
2002 |
|
2-4 |
p. 353-360 8 p. |
artikel |
48 |
Virtual enterprise and its intelligence management
|
Xu, Weixuan |
|
2002 |
|
2-4 |
p. 199-205 7 p. |
artikel |