nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A binary multiple knapsack model for single machine scheduling with machine unavailability
|
Laalaoui, Y. |
|
2016 |
72 |
C |
p. 71-82 12 p. |
artikel |
2 |
A branch and price algorithm for the pharmacy duty scheduling problem
|
Ceyhan, Gökhan |
|
2016 |
72 |
C |
p. 175-182 8 p. |
artikel |
3 |
A convex optimization approach for solving the single-vehicle cyclic inventory routing problem
|
Lefever, Wouter |
|
2016 |
72 |
C |
p. 97-106 10 p. |
artikel |
4 |
A multi-objective optimization approach for integrated production planning under interval uncertainties in the steel industry
|
Lin, Jianhua |
|
2016 |
72 |
C |
p. 189-203 15 p. |
artikel |
5 |
An adaptive large neighborhood search heuristic for the Pickup and Delivery Problem with Time Windows and Scheduled Lines
|
Ghilas, Veaceslav |
|
2016 |
72 |
C |
p. 12-30 19 p. |
artikel |
6 |
An exact algorithm for biobjective mixed integer linear programming problems
|
Soylu, Banu |
|
2016 |
72 |
C |
p. 204-213 10 p. |
artikel |
7 |
A note on “minimizing makespan in three machine flow shop with deteriorating jobs”
|
Jafari, Abbas-Ali |
|
2016 |
72 |
C |
p. 93-96 4 p. |
artikel |
8 |
A tabu search based memetic algorithm for the max-mean dispersion problem
|
Lai, Xiangjing |
|
2016 |
72 |
C |
p. 118-127 10 p. |
artikel |
9 |
Compromise ratio with weighting functions in a Tabu Search multi-criteria approach to examination timetabling
|
Amaral, Paula |
|
2016 |
72 |
C |
p. 160-174 15 p. |
artikel |
10 |
Computational investigation of simple memetic approaches for continuous global optimization
|
Cabassi, Federico |
|
2016 |
72 |
C |
p. 50-70 21 p. |
artikel |
11 |
Dynamic control of a closed two-stage queueing network for outfitting process in shipbuilding
|
Dong, F. |
|
2016 |
72 |
C |
p. 1-11 11 p. |
artikel |
12 |
ILP heuristics and a new exact method for bi-objective 0/1 ILPs: Application to FTTx-network design
|
Leitner, Markus |
|
2016 |
72 |
C |
p. 128-146 19 p. |
artikel |
13 |
Investing in lead-time variability reduction in a collaborative vendor–buyer supply chain model with stochastic lead time
|
Lin, Hsien-Jen |
|
2016 |
72 |
C |
p. 43-49 7 p. |
artikel |
14 |
Lower bounds for large traveling umpire instances: New valid inequalities and a branch-and-cut algorithm
|
Oliveira, Lucas de |
|
2016 |
72 |
C |
p. 147-159 13 p. |
artikel |
15 |
Mean-univariate GARCH VaR portfolio optimization: Actual portfolio approach
|
Ranković, Vladimir |
|
2016 |
72 |
C |
p. 83-92 10 p. |
artikel |
16 |
Optimal physician assignment and patient demand allocation in an outpatient care network
|
Li, Yan |
|
2016 |
72 |
C |
p. 107-117 11 p. |
artikel |
17 |
Scheduling two parallel machines with machine-dependent availabilities
|
He, Jie |
|
2016 |
72 |
C |
p. 31-42 12 p. |
artikel |
18 |
Title Page/Editorial Board
|
|
|
2016 |
72 |
C |
p. i- 1 p. |
artikel |
19 |
Variable neighborhood search for the second type of two-sided assembly line balancing problem
|
Lei, Deming |
|
2016 |
72 |
C |
p. 183-188 6 p. |
artikel |