nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A heuristic method for large-scale multi-facility location problems
|
Levin, Yuri |
|
2004 |
31 |
2 |
p. 257-272 16 p. |
artikel |
2 |
A new heuristic for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
|
Allahverdi, Ali |
|
2004 |
31 |
2 |
p. 157-180 24 p. |
artikel |
3 |
An implementation of Newton-like methods on nonlinearly constrained networks
|
Mijangos, E. |
|
2004 |
31 |
2 |
p. 181-199 19 p. |
artikel |
4 |
A queueing control model for retail services having back room operations and cross-trained workers
|
Berman, Oded |
|
2004 |
31 |
2 |
p. 201-222 22 p. |
artikel |
5 |
Branch and peg algorithms for the simple plant location problem
|
Goldengorin, Boris |
|
2004 |
31 |
2 |
p. 241-255 15 p. |
artikel |
6 |
Cycling in linear programming problems
|
Gass, Saul I. |
|
2004 |
31 |
2 |
p. 303-311 9 p. |
artikel |
7 |
Erratum to “A simulated annealing algorithm for dynamic layout problem”
|
Baykasoǧlu, Adil |
|
2004 |
31 |
2 |
p. 313-315 3 p. |
artikel |
8 |
Group prioritization in the AHP by fuzzy preference programming method
|
Mikhailov, L. |
|
2004 |
31 |
2 |
p. 293-301 9 p. |
artikel |
9 |
On an inventory model for deteriorating items with stock dependent and time-varying demand rates
|
Balkhi, Zaid T. |
|
2004 |
31 |
2 |
p. 223-240 18 p. |
artikel |
10 |
Title Page/Editorial Board
|
|
|
2004 |
31 |
2 |
p. i- 1 p. |
artikel |
11 |
Towards the real time solution of strike force asset allocation problems
|
Li, V.C. |
|
2004 |
31 |
2 |
p. 273-291 19 p. |
artikel |