no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A multi-agent approach with distributed fuzzy logic control
|
Bohner, Petra |
|
1995 |
26 |
3 |
p. 219-227 9 p. |
article |
2 |
A robotic system for handling textile and non rigid flat materials
|
Paraschidis, K |
|
1995 |
26 |
3 |
p. 303-313 11 p. |
article |
3 |
Author index volume 26
|
|
|
1995 |
26 |
3 |
p. 325-326 2 p. |
article |
4 |
BIDPREP — An approach for simultaneous bid preparation
|
Hirsch, B.E. |
|
1995 |
26 |
3 |
p. 273-279 7 p. |
article |
5 |
Calendar
|
|
|
1995 |
26 |
3 |
p. 315-322 8 p. |
article |
6 |
Comparison of information systems for engineer-to-order and make-to-stock situations
|
Wortmann, Hans |
|
1995 |
26 |
3 |
p. 261-271 11 p. |
article |
7 |
Computer integrated manufacturing and automation
|
Groumpos, Peter P. |
|
1995 |
26 |
3 |
p. 205-207 3 p. |
article |
8 |
Contents volume 26
|
|
|
1995 |
26 |
3 |
p. 327-328 2 p. |
article |
9 |
Coping with model-reality differences in industrial process optimisation — A review of integrated system optimisation and parameter estimation (isope)
|
Roberts, P.D. |
|
1995 |
26 |
3 |
p. 281-290 10 p. |
article |
10 |
Information system concept for the management of distributed production
|
Hirsch, Bernd E. |
|
1995 |
26 |
3 |
p. 229-241 13 p. |
article |
11 |
Integrated process design: A generic control theory/design based framework
|
Karcanias, Nicos |
|
1995 |
26 |
3 |
p. 291-301 11 p. |
article |
12 |
Modern fieldbus communication architectures for real-time industrial applications
|
Koubias, S.A. |
|
1995 |
26 |
3 |
p. 243-252 10 p. |
article |
13 |
Programming, scheduling, and control of flexible assembly systems
|
Valckenaers, P. |
|
1995 |
26 |
3 |
p. 209-218 10 p. |
article |
14 |
Subject index volume 26
|
|
|
1995 |
26 |
3 |
p. 323-324 2 p. |
article |
15 |
The modelling and simulation of a pick and place computer-integrated manufacturing (CIM) cell
|
Bartlett, H. |
|
1995 |
26 |
3 |
p. 253-260 8 p. |
article |