nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A fair method for centralized optimization of multi-TSO power systems
|
Phulpin, Yannick |
|
2009 |
31 |
9 |
p. 482-488 7 p. |
artikel |
2 |
A grid operation model: Resource demand for an adequate incident management in high-, medium-, and low-voltage grids
|
Guarisco, Michael |
|
2009 |
31 |
9 |
p. 504-511 8 p. |
artikel |
3 |
Application of wavelets and Prony method for disturbance detection in fixed speed wind farms
|
Lobos, T. |
|
2009 |
31 |
9 |
p. 429-436 8 p. |
artikel |
4 |
Considerations about synchrophasors measurement in dynamic system conditions
|
Warichet, Jacques |
|
2009 |
31 |
9 |
p. 452-464 13 p. |
artikel |
5 |
Decentralized tap changer blocking and load shedding against voltage instability: Prospective tests on the RTE system
|
Capitanescu, F. |
|
2009 |
31 |
9 |
p. 570-576 7 p. |
artikel |
6 |
Editorial
|
Gomez, Tomas |
|
2009 |
31 |
9 |
p. 427-428 2 p. |
artikel |
7 |
Editorial Board
|
|
|
2009 |
31 |
9 |
p. IFC- 1 p. |
artikel |
8 |
Fault location for underground distribution feeders: An extended impedance-based formulation with capacitive current compensation
|
Filomena, André D. |
|
2009 |
31 |
9 |
p. 489-496 8 p. |
artikel |
9 |
Improvements in current European network regulation to facilitate the integration of distributed generation
|
Frías, P. |
|
2009 |
31 |
9 |
p. 445-451 7 p. |
artikel |
10 |
Influence of the Emissions Trading Scheme on generation scheduling
|
Kockar, Ivana |
|
2009 |
31 |
9 |
p. 465-473 9 p. |
artikel |
11 |
Multi-scale simulation of multi-machine power systems
|
Gao, Feng |
|
2009 |
31 |
9 |
p. 538-545 8 p. |
artikel |
12 |
On feasibility boundaries of electrical power grids in steady state
|
Krause, O. |
|
2009 |
31 |
9 |
p. 437-444 8 p. |
artikel |
13 |
Optimization of numerical integration methods for the simulation of dynamic phasor models in power systems
|
Demiray, Turhan |
|
2009 |
31 |
9 |
p. 512-521 10 p. |
artikel |
14 |
Parallel solution of large power system networks using the Multi-Area Thévenin Equivalents (MATE) algorithm
|
Tomim, M.A. |
|
2009 |
31 |
9 |
p. 497-503 7 p. |
artikel |
15 |
Practical aspects in solving the medium-term operation planning problem of hydrothermal power systems by using the progressive hedging method
|
dos Santos, Marcelo L.L. |
|
2009 |
31 |
9 |
p. 546-552 7 p. |
artikel |
16 |
Probabilistic evaluation of reserve requirements of generating systems with renewable power sources: The Portuguese and Spanish cases
|
Matos, Manuel |
|
2009 |
31 |
9 |
p. 562-569 8 p. |
artikel |
17 |
Probabilistic load flow with wind production uncertainty using cumulants and Cornish–Fisher expansion
|
Usaola, Julio |
|
2009 |
31 |
9 |
p. 474-481 8 p. |
artikel |
18 |
Real-time control of power systems using nodal prices
|
Jokić, A. |
|
2009 |
31 |
9 |
p. 522-530 9 p. |
artikel |
19 |
Structural vulnerability of energy distribution systems: Incorporating infrastructural dependencies
|
Helseth, Arild |
|
2009 |
31 |
9 |
p. 531-537 7 p. |
artikel |
20 |
Transmission network expansion planning under deliberate outages
|
Alguacil, Natalia |
|
2009 |
31 |
9 |
p. 553-561 9 p. |
artikel |