nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A branch-and-bound algorithm for the continuous facility layout problem
|
Xie, Wei |
|
2008 |
32 |
4-5 |
p. 1016-1028 13 p. |
artikel |
2 |
A framework for addressing stochastic and combinatorial aspects of scheduling and resource allocation in pharmaceutical R&D pipelines
|
Varma, Vishal A. |
|
2008 |
32 |
4-5 |
p. 1000-1015 16 p. |
artikel |
3 |
A hierarchical decision procedure for productivity innovation in large-scale petrochemical processes
|
Han, Chonghun |
|
2008 |
32 |
4-5 |
p. 1029-1041 13 p. |
artikel |
4 |
A multistage stochastic programming approach with strategies for uncertainty reduction in the synthesis of process networks with uncertain yields
|
Tarhan, Bora |
|
2008 |
32 |
4-5 |
p. 766-788 23 p. |
artikel |
5 |
A novel continuous time representation for the scheduling of pipeline systems with pumping yield rate constraints
|
Rejowski Jr., R. |
|
2008 |
32 |
4-5 |
p. 1042-1066 25 p. |
artikel |
6 |
Approximate nonlinear model predictive control with in situ adaptive tabulation
|
Hedengren, John D. |
|
2008 |
32 |
4-5 |
p. 706-714 9 p. |
artikel |
7 |
A review of features in current automatic generation software for hydrocarbon oxidation mechanisms
|
Pierucci, Sauro |
|
2008 |
32 |
4-5 |
p. 805-826 22 p. |
artikel |
8 |
Discrete element simulation of liquid-particle flows
|
Apostolou, K. |
|
2008 |
32 |
4-5 |
p. 841-856 16 p. |
artikel |
9 |
Dynamic scheduling of multiproduct pipelines with multiple delivery due dates
|
Cafaro, Diego C. |
|
2008 |
32 |
4-5 |
p. 728-753 26 p. |
artikel |
10 |
Editorial Board
|
|
|
2008 |
32 |
4-5 |
p. CO2- 1 p. |
artikel |
11 |
High fidelity mathematical model building with experimental data: A Bayesian approach
|
Blau, Gary |
|
2008 |
32 |
4-5 |
p. 971-989 19 p. |
artikel |
12 |
Improving unit-specific event based continuous-time approaches for batch processes: Integrality gap and task splitting
|
Janak, Stacy L. |
|
2008 |
32 |
4-5 |
p. 913-955 43 p. |
artikel |
13 |
Incremental identification of hybrid process models
|
Kahrs, O. |
|
2008 |
32 |
4-5 |
p. 694-705 12 p. |
artikel |
14 |
Informative gene selection and design of regulatory networks using integer optimization
|
Yang, E. |
|
2008 |
32 |
4-5 |
p. 633-649 17 p. |
artikel |
15 |
MPC on a chip—Recent advances on the application of multi-parametric model-based control
|
Dua, P. |
|
2008 |
32 |
4-5 |
p. 754-765 12 p. |
artikel |
16 |
Multiscale theory for linear dynamic processes
|
Stephanopoulos, George |
|
2008 |
32 |
4-5 |
p. 885-912 28 p. |
artikel |
17 |
Multiscale theory for linear dynamic processes
|
Stephanopoulos, George |
|
2008 |
32 |
4-5 |
p. 857-884 28 p. |
artikel |
18 |
Preface—Reklaitis 65th birthday special issue
|
Venkatasubramanian, Venkat |
|
2008 |
32 |
4-5 |
p. 631-632 2 p. |
artikel |
19 |
Process scheduling under uncertainty: Review and challenges
|
Li, Zukui |
|
2008 |
32 |
4-5 |
p. 715-727 13 p. |
artikel |
20 |
Real-time optimization of the pulp mill benchmark problem
|
Mercangöz, Mehmet |
|
2008 |
32 |
4-5 |
p. 789-804 16 p. |
artikel |
21 |
Real-time risk analysis of safety systems
|
Meel, Anjana |
|
2008 |
32 |
4-5 |
p. 827-840 14 p. |
artikel |
22 |
Robust sensor network design for fault diagnosis
|
Bhushan, Mani |
|
2008 |
32 |
4-5 |
p. 1067-1084 18 p. |
artikel |
23 |
Scaled steady state models for effective on-line applications
|
Lid, Tore |
|
2008 |
32 |
4-5 |
p. 990-999 10 p. |
artikel |
24 |
Scheduling multistage batch plants with parallel units and no interstage storage
|
Liu, Yu |
|
2008 |
32 |
4-5 |
p. 671-693 23 p. |
artikel |
25 |
Special Issue Contents
|
|
|
2008 |
32 |
4-5 |
p. v-vi nvt p. |
artikel |
26 |
Synthesis of crystallization processes for systems involving solid solutions
|
Lin, Sze W. |
|
2008 |
32 |
4-5 |
p. 956-970 15 p. |
artikel |
27 |
Towards an integrated framework for supply chain management in the batch chemical process industry
|
Puigjaner, Luis |
|
2008 |
32 |
4-5 |
p. 650-670 21 p. |
artikel |