nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A simple approximation for IFR weibull renewal functions
|
Spearman, Mark L. |
|
1989 |
29 |
1 |
p. 73-80 8 p. |
artikel |
2 |
Cost-space optimal (N∗ , m, n∗) parallel-series systems
|
Venugopal, N. |
|
1989 |
29 |
1 |
p. 9-15 7 p. |
artikel |
3 |
Economic analysis of the M/M/R machine repair problem with warm standbys
|
Sivazlian, B.D. |
|
1989 |
29 |
1 |
p. 25-35 11 p. |
artikel |
4 |
Economic design of maintained reliability systems
|
Ntuen, Celestine A. |
|
1989 |
29 |
1 |
p. 3-7 5 p. |
artikel |
5 |
Editorial Board
|
|
|
1989 |
29 |
1 |
p. IFC- 1 p. |
artikel |
6 |
Network reliability and availability analysis to minimize downtime costs for communication networks
|
Pulat, Simin |
|
1989 |
29 |
1 |
p. 37-48 12 p. |
artikel |
7 |
Optimal repair stage for K-out-of-N systems
|
Venugopal, N. |
|
1989 |
29 |
1 |
p. 17-19 3 p. |
artikel |
8 |
Optimal replacement time of an equipment via simulation for truncated failure distributions
|
Venkatakrishnan, K.S. |
|
1989 |
29 |
1 |
p. 49-52 4 p. |
artikel |
9 |
Optimum scheduling of a new maintenance program under stochastic degradation
|
Sivazlian, B.D. |
|
1989 |
29 |
1 |
p. 57-71 15 p. |
artikel |
10 |
Profit evaluation of a two unit cold standby system with random appearance and disappearance time of the service facility
|
Singh, S.K. |
|
1989 |
29 |
1 |
p. 21-24 4 p. |
artikel |
11 |
RAM/COST special edition
|
G.W.A.D., |
|
1989 |
29 |
1 |
p. 1- 1 p. |
artikel |
12 |
The calculation of the present worth single payment factors for reliability systems when life cycle is arbitrary
|
Ntuen, Celestine A. |
|
1989 |
29 |
1 |
p. 53-55 3 p. |
artikel |