nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A model to quantify reliability of human performance in man-machine systems
|
Raouf, A. |
|
1978 |
17 |
1 |
p. 155-163 9 p. |
artikel |
2 |
A practical method of optimizing system life cycle costs vs availability
|
Werden, Robert B. |
|
1978 |
17 |
1 |
p. 1-7 7 p. |
artikel |
3 |
A system reliability and maintainability simulation exercise
|
Rehg, Virgil R. |
|
1978 |
17 |
1 |
p. 31-34 4 p. |
artikel |
4 |
Biographies
|
|
|
1978 |
17 |
1 |
p. 223-234 12 p. |
artikel |
5 |
Editorial Board
|
|
|
1978 |
17 |
1 |
p. IFC- 1 p. |
artikel |
6 |
Effect of reliability programs on life cycle cost — A case history
|
Bertschy, Roland G. |
|
1978 |
17 |
1 |
p. 9-14 6 p. |
artikel |
7 |
Effects of design automation on the reliability and maintainability design of electronic systems
|
Arsenault, J.E. |
|
1978 |
17 |
1 |
p. 143-153 11 p. |
artikel |
8 |
Effects of Weibull hazard rate on common cause failure analysis of reliability networks
|
Dhillon, Balbir S. |
|
1978 |
17 |
1 |
p. 59-65 7 p. |
artikel |
9 |
Efficient management of critically important systems
|
Malik, Mazhar Ali Khan |
|
1978 |
17 |
1 |
p. 173-178 6 p. |
artikel |
10 |
Engineering and reliability aspects of connectors in electronic system applications
|
Desmet, H. |
|
1978 |
17 |
1 |
p. 185-191 7 p. |
artikel |
11 |
Estimating software reliability from test data
|
Nelson, Eldred |
|
1978 |
17 |
1 |
p. 67-73 7 p. |
artikel |
12 |
Fault trees revisited
|
Wolfe, W.A. |
|
1978 |
17 |
1 |
p. 117-128 12 p. |
artikel |
13 |
Foreword
|
|
|
1978 |
17 |
1 |
p. v- 1 p. |
artikel |
14 |
Fuel handling system availability — How good must it be?
|
Alting Mees, H.W. |
|
1978 |
17 |
1 |
p. 93-97 5 p. |
artikel |
15 |
LCC — The implications on internal data collection
|
Darch, M.B. |
|
1978 |
17 |
1 |
p. 25-29 5 p. |
artikel |
16 |
Materials-related aspects of reliability of fracture-sensitive structures
|
Robert Hay, D. |
|
1978 |
17 |
1 |
p. 179-184 6 p. |
artikel |
17 |
Method of reliability analysis of control systems for nuclear power plants
|
Basu, Samir |
|
1978 |
17 |
1 |
p. 105-116 12 p. |
artikel |
18 |
On optimizing maintainability
|
Nathan Johnson Jr., |
|
1978 |
17 |
1 |
p. 41-46 6 p. |
artikel |
19 |
Operating system redundancy on an active, a stand-by or a passive basis
|
Klaassen, Klaas B. |
|
1978 |
17 |
1 |
p. 35-40 6 p. |
artikel |
20 |
Reliability of large, equipment and systems of nuclear power plants
|
Hashmi, M.F. |
|
1978 |
17 |
1 |
p. 99-104 6 p. |
artikel |
21 |
Reliable software through requirements definition using data abstractions
|
Bezanson, William R. |
|
1978 |
17 |
1 |
p. 85-91 7 p. |
artikel |
22 |
Screening methods and experience with MOS memory
|
Pappu, R.V. |
|
1978 |
17 |
1 |
p. 193-199 7 p. |
artikel |
23 |
Some aspects of the need for redundancy in telecommunication transmission systems
|
Tigerman, B. |
|
1978 |
17 |
1 |
p. 129-135 7 p. |
artikel |
24 |
Structuring software development for reliability
|
Greenspan, Sol J. |
|
1978 |
17 |
1 |
p. 75-83 9 p. |
artikel |
25 |
System assurance in a rapid transit system
|
Ling, Aloysius H.K. |
|
1978 |
17 |
1 |
p. 165-172 8 p. |
artikel |
26 |
System diagnosis with FLIP
|
DesMarais, P. |
|
1978 |
17 |
1 |
p. 47-52 6 p. |
artikel |
27 |
The AN/ARC-164 radio: life-cycle-cost savings
|
Boden, William H. |
|
1978 |
17 |
1 |
p. 15-23 9 p. |
artikel |
28 |
The assessment and allocation of reliability and maintainability parameters to mass transit operations
|
Bartholomew, Bill |
|
1978 |
17 |
1 |
p. 137-142 6 p. |
artikel |
29 |
The influence of design and process parameters on the reliability of CMOS integrated circuits
|
Aitken, A. |
|
1978 |
17 |
1 |
p. 201-210 10 p. |
artikel |
30 |
The microprocessor failure rate predictions
|
Halil, B. |
|
1978 |
17 |
1 |
p. 211-221 11 p. |
artikel |
31 |
The time dependent failure rate of a system consisting of three 50%-units in active parallel
|
Nieuwhof, G.W.E. |
|
1978 |
17 |
1 |
p. 53-58 6 p. |
artikel |