  Study of a sequencing batch reactor performance in soft drink wastewater treatment
 
 
Titel: Study of a sequencing batch reactor performance in soft drink wastewater treatment
Auteur: Gean Carlos Postingel Garcia
Rafael Brito de Moura
Lênin de Matos Silva
Francisco Javier Cuba Terán
Verschenen in: Engenharia ambiental
Paginering: Jaargang 6 (2009) nr. 2 pagina's 89-99
Jaar: 2009
Inhoud: A sequencing batch aerobic reactor in pilot scale was constructed and operated with intermittent aeration in Wastewater Treatment Lab of Faculdade de Ciências e Tecnologia de Unesp at Presidente Prudente city. Research was conducted in order to improve reactor’s performance in organic matter and nitrogen removal by means of the application of different aeration times. In 12 and 14 hours long batch tests, with 6 and 8 hours of aeration, more than 96% of organic matter was removed by the third hour in both cases, in the other hand, nitrification showed 50 and 55% of removal at the end of every cycle. Tough showing nitrate removal, denitrification requires more research to be done in order to obtain more accurate data related with best cycle time for both pollutants removal.Key-words: sequencing batchs, aerobic treatment, industrial wastewater.A sequencing batch aerobic reactor in pilot scale was constructed and operated with intermittent aeration in Wastewater Treatment Lab of Faculdade de Ciências e Tecnologia de Unesp at Presidente Prudente city. Research was conducted in order to improve reactor’s performance in organic matter and nitrogen removal by means of the application of different aeration times. In 12 and 14 hours long batch tests, with 6 and 8 hours of aeration, more than 96% of organic matter was removed by the third hour in both cases, in the other hand, nitrification showed 50 and 55% of removal at the end of every cycle. Tough showing nitrate removal, denitrification requires more research to be done in order to obtain more accurate data related with best cycle time for both pollutants removal.Key-words: sequencing batchs, aerobic treatment, industrial wastewater.
Uitgever: Environmental Engineering Course / UNIPINHAL (provided by DOAJ)